Runway at NATO-airport Büchel


7. July 2015

The LBB office branch Koblenz commissioned our laboratory with the check testing and the accompanying consultation during the performed road paving work at the Büchel airport runway.

A total of 103000 m² split mastic asphalt SMA 11 S was installed during the short and midterm perpetual air port service, utilizing two staggered finishers with a minimum working width of 11,5 meters including an additional feeder.