7. July 2015
The LBB office branch Koblenz commissioned our laboratory with the check testing and the accompanying consultation during the performed road paving work at the Büchel airport runway.
A total of 103000 m² split mastic asphalt SMA 11 S was installed during the short and midterm perpetual air port service, utilizing two staggered finishers with a minimum working width of 11,5 meters including an additional feeder.