Department for earthwork: B50, motorway interchange BAB 1/BAB 60


By order of LBM Trier:

Contractor: ARGE B 50, 1. construction stage, part 2, Fa. Lehnen / Fa. Kohl
Building activity: B 50, motorway interchange BAB 1/BAB 60 - Longkamp, 1. construction stage, part 2
appr. 165.000 m² embankment footprint with a width of appr. 0,30 m
appr. 15.000 m² embankment footprint with a width of 0,60 m
appr. 250.000 m³ loosened and embedded soil were improved
appr. 8000.000 m³ of soil was loosened and embedded in total